Contact Disinfection Basin
Surprise, AZ 2007
Contact Disinfection Basin
Contact Disinfection Basin Project Description:
The Tyfo® Fibrwrap® Systems were used to meet the requirements set forth by the engineer of record. The design requirement was to provide continuity to the existing transverse slab steel at the new disinfection contact basin in Surprise, Arizona. The lack of steel continuity was the result of a construction anomaly.

Solution:
The final coat over the Tyfo® SCH-41 composite was a thick layer of thickened Tyfo® S epoxy and dry, coarse sand broadcast over it. This provided a surface suited for bonding between the repaired area and the new concrete overlay to be poured over the slab.

Summary:
Fibrwrap® Construction Inc. successfully completed the installation of the Tyfo® Fibrwrap® Systems by working nights to avoid working in extremely warm weather conditions during the day. The project was completed well before schedule due to the ease of installation of the Tyfo® Fibrwrap® Systems.
Contact Disinfection Basin
Contact Disinfection Basin


LATEST NEWS
 MORE INFORMATION
 
                              
                                  


Your Name  
Your Email
Comments
 
  
  Join mailing list for latest news and tech updates

 
Follow us on: