Marina Towers Wall
Chicago, IL
Marina Towers Wall
Marina Towers Wall Project Description:
The waste chute in the basement of the towers was being widened. This necessitated cutting the existing wall and potentially cutting the reinforcing steel.

Solution:
A layer of fiber wrap was detailed to replace the steel that would be cut by widening the opening. A layer of the Tyfo® RR system was applied for smoke and flame protection, as well as, to increase the durability of the installation.

Summary:
The work area was very confined and difficult to access. The composite solution allowed the application to be done in this restricted area.  
Marina Towers Wall
Marina Towers Wall


Download

LATEST NEWS
 MORE INFORMATION
 
                              
                                  


Your Name  
Your Email
Comments
 
  
  Join mailing list for latest news and tech updates

 
Follow us on: