Project Description: The two-way slabs above the loading dock were not able to take the new loads required for the storage of merchandise above. The slabs were overstressed by approximately 25% and the best design solution was one using the TYFO® SCH-41 System.
Solution: Fibrwrap Construction was able to install the material with minimal disruption to the building operations. The existing sprinklers and electrical conduits did not need to be removed and replaced.