Wal-Mart
La Mesa, CA 2006
Wal-Mart
Wal-Mart Project Description:
The two-way slabs above the loading dock were not able to take the new loads required for the storage of merchandise above.  The slabs were overstressed by approximately 25% and the best design solution was one using the TYFO® SCH-41 System.

Solution:
Fibrwrap Construction was able to install the material with minimal disruption to the building operations.  The existing sprinklers and electrical conduits did not need to be removed and replaced.